More ships are going back through the Suez Canal. In early November 2026, Evergreen sent one of its large container ships through the canal and said more sailings will follow. ONE and Yang Ming have announced scheduled Suez services from November, and Maersk and Hapag-Lloyd, which returned some services in July, have added a service linking the Middle East and India with Europe. According to BIMCO, container capacity passing through the canal in early October went above half of the pre-2024 level for the first time since the long diversion around Africa began.
What is changing for ships
- Shorter voyages. An Asia to Europe trip through Suez takes around 26 days, against around 36 days around the Cape of Good Hope, and roughly 3,300 nautical miles less.
- Less fuel per voyage. Fewer sea days mean lower fuel use and lower emissions per trip.
- Busier ports along the route. Analysts expect short-term congestion at some hubs as schedules shift back.
The return is gradual and depends on conditions in the region, so routings can still change.
What it means for machinery and spares
Engines that have worked hard. For about two years, many ships ran the longer route at high load and with long stretches between port calls. Main engines, generators, turbochargers, fuel pumps and purifiers have built up running hours faster than planned. Many of these ships are now due for overhauls that were pushed back.
Tighter port windows. Shorter voyages and busy ports leave less time alongside. Spares have to be ready at the right port when the ship arrives, not ordered after it berths.
Middle East and Red Sea ports matter again. With more traffic between Asia, the Gulf, India and Europe, ports in the Gulf and the Red Sea are useful again for delivering spares and doing repairs on the way.
Planning beats emergency buying. Owners who line up overhaul kits and major spares in advance avoid paying emergency prices and air freight when a ship is only in port for a day.
Practical steps for superintendents
- Check running hours on main and auxiliary engines, turbochargers and separators against the maker’s overhaul intervals.
- Plan overhauls that were deferred, and order the major parts before the ship reaches the repair port.
- Review spares on board for fuel injection equipment and auxiliary engines, which wear fastest at high load.
How AMAF Marine can help
AMAF Marine supplies engine spares, pumps, compressors, separators and heat exchangers for ships trading through the Gulf, the Red Sea, India and beyond. We offer used and reconditioned original maker equipment, as well as new spares (OEM and quality equivalents), shipped from our warehouse to any port in time for your ship’s arrival.
Send us your requirement and the port and ETA, and we will quote within 48 hours.
Source: Supply Chain Digital, 12 November 2026, quoting the Suez Canal Authority, BIMCO and Clarksons Research.



